admin:poweroff [2022/02/08 12:59]
peppe
admin:poweroff [2022/04/19 12:11] (current)
peppe
Line 1: Line 1:
 ===== Διακοπή ρεύματος και επαναφορά ===== ===== Διακοπή ρεύματος και επαναφορά =====
  
-Altus KVM 10.1.2.10+PRINT BEFORE USE! 
 +Material may not be available during shutdown process. 
 + 
 +Updated 19/04/2022\\ 
 +\\ 
 +  * Altus KVM 10.1.2.10 
 +  * Cisco switch port 6: trunk for recovery 
 +  * Backup! Transfer to safe media!
  
 ==== Διακοπή ρεύματος ==== ==== Διακοπή ρεύματος ====
Line 7: Line 14:
 === Επίπεδο 1 === === Επίπεδο 1 ===
 == HP DL145G2 == == HP DL145G2 ==
-titan (old printserver), iLO 10.1.2.12\\ +  - Close control units poweroff 
-csforum\\ +  - titan (old printserver), iLO 10.1.2.12\\ 
-aeolus\\ +  csforum, iLO 10.1.2.30\\ 
-glaucus\\+  aeolus, iLO 10.1.2.150\\ 
 +  glaucus\\ 
 +  - unmount /usr/home/{students,staff,grads} from scylla\\ 
 + 
 +== Εργαστήρια == 
 +  * Shutdown/poweroff 
 +   
 +== 3D printers == 
 +  * Tevo Tarantula poweroff 
 +  * Sun Ultra20 poweroff 
 +  * Z-printer poweroff 
 +  * Z-printer storage shutdown (Long button press -> shutdown procedure)
      
-== HP DL380G6 esxi2, 10.7.4.6 == +== HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == 
-titan-printserver (new printserver)\\ +  titan-printserver (new printserver, titan-new)\\ 
-mysql-server\\ +  mysql-server\\ 
-calliope-www (cse www)\\+  calliope-www (cse www, calliope-vlan74)\\
  
-== HP DL380G6 esxi3, 10.7.4.7 == +== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == 
-zeus-debian\\+  zeus-debian (zeus-vlan74)\\
  
 == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 ==
-engineering www (jupiter)+  * engineering www (jupiter)
  
-== Dell R630 #1 (UP) == +== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == 
-examservers+  examservers (NOT!)
  
 === Επίπεδο 2 === === Επίπεδο 2 ===
  
-== Dell R630 #1 (UP) == +== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 == 
-gaia+  gaia
  
-== HP DL380G6 esxi3, 10.7.4.7 == +== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == 
-uranus-debian+  uranus-debian
  
 === Επίπεδο 3 === === Επίπεδο 3 ===
  
-== EMC VNXe3100 == +== EMC VNXe3100, 10.7.4.9 == 
-poweroff procedure (+WAIT, UNPLUG!)+Poweroff procedure (+WAIT, UNPLUG!) 
 + 
 +  Shut down the system 
 +   
 +  The shutdown process can take between 25 to 45 minutes to complete. 
 +  During this time, the connection to the system will be lost and 
 +  you will not have access to Unisphere or the online help. 
 +   
 +  1. From Unisphere, select Settings > Service System. 
 +  2. Enter the Service password to access the Service System page. 
 +  3. Under Service Actions, select Shut Down System. 
 +  4. Click Execute service action to shut down the 
 +     storage processors (SPs). 
 +  5. In the Service Confirmation dialog box, click OK. 
 +  6. Check the status of the shutdown process by looking at the 
 +     SP LED indicators: 
 +   
 +  On VNXe3100 and VNXe3150 systems, the shutdown process is complete 
 +  when only the Storage Processor Power LEDs are blinking and all 
 +  other Storage Processor LEDs are off. 
 +   
 +  7. If you are relocating hardware, disconnect cables in the 
 +     following order: 
 +   
 +  Disconnect the power cables from disk-processor enclosure (DPE) 
 +  to power down the SPs. 
 +  Disconnect the power cable from the DAEs to power them down. 
  
 == HP DL145G2 == == HP DL145G2 ==
-scylla +  - scylla, iLO 10.1.2.45\\ 
-rescue+  rescue, iLO 10.1.2.49\\
  
 == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 ==
-gatepc73\\ +  - gatepc73\\ 
-gatepc74\\ +  gatepc74\\ 
-gatepc76\\ +  gatepc76\\ 
-clonezilla SE\\ +  clonezilla SE\\ 
-charybdis\\+  charybdis\\ 
 + 
 +== ESXi(s) == 
 +  * Shutdown 10.7.4.6 
 +  * Shutdown 10.7.4.7 
 +  * Shutdown 10.7.4.125 
 +  * Shutdown 10.1.2.40 
 +  * Shutdown 10.1.2.41 
 + 
 +== Power cables == 
 +  - Unplug all machines 
 +  - Turn off, unplug 2x online UPSs 
 +  - Turn off, unplug 1x rescue UPS (in rack) 
 +  - Unplug Cisco switch 
 +  - Unplug HP switch 
 +  - Unplug mgmt switch 
 +  - Unplug ATEN KVM
  
 == personal machines == == personal machines ==
-poweroff+  * poweroff
  
 ==== Επαναφορά ρεύματος ==== ==== Επαναφορά ρεύματος ====
Line 57: Line 118:
 === Επίπεδο 1 === === Επίπεδο 1 ===
  
-== EMC VNXe3100 == +== Power on == 
-poweroν procedure+  - ATEN KVM 
 +  - Cisco switch 
 +  - HP switch 
 +  - mgmt switch 
 +  - 2x online UPSs 
 +  - 1x rescue UPS 
 + 
 +== EMC VNXe3100, 10.7.4.9 == 
 +  Power up the system (20+ minutes! Check www!) 
 +   
 +  To power up a system that is fully powered down: 
 +  1. Reconnect the power cables to each DAE in the following exact order: 
 +  DAE 0 
 +  DAE 1 
 +  DAE 2 
 +  Power up any remaining DAEs in ascending order. 
 +   
 +  The green Power Status LED powerlines.gif on each DAE turns on. 
 +  For more information on the LEDs, see System LED displays. 
 +  2. Reconnect the power cables to each SP in exactly this order: 
 +  SP A 
 +  SP B 
 +   
 +  The green Power Status LED on each SP turns on.
  
 == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == == HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 ==
-gatepc73\\ +  - gatepc73\\ 
-gatepc74\\ +  gatepc74\\ 
-gatepc76\\ +  gatepc76\\ 
-clonezilla SE\\+  clonezilla SE\\
  
 == HP DL145G2 == == HP DL145G2 ==
-titan (old printserver), iLO 10.1.2.12\\ +  - titan (old printserver), iLO 10.1.2.12\\ 
-csforum\\ +  csforum, iLO 10.1.2.30\\ 
-aeolus\\ +  aeolus, iLO 10.1.2.150\\ 
-glaucus\\ +  glaucus\\ 
-scylla\\ +  scylla, iLO 10.1.2.45\\ 
-rescue +  rescue, iLO 10.1.2.49\\
- +
-== HP DL380G6 esxi2, 10.7.4.6 == +
-titan-printserver (new printserver)\\ +
-mysql-server (NOT!)\\ +
- +
-== HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == +
-engineering www (jupiter)\\ +
-charybdis (NOT!)\\+
  
  
 === Επίπεδο 2 === === Επίπεδο 2 ===
  
-== HP DL380G6 esxi3, 10.7.4.7 == +== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 == 
-uranus-debian +  uranus-debian 
- +  * check students FS 
-== Dell R630 #1 (UP) == +  * check grads FS 
-gaia+  * check staff FS 
 +  * check quotas
  
 +== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 ==
 +  * gaia
  
  
 === Επίπεδο 3 === === Επίπεδο 3 ===
  
-== HP DL380G6 esxi2, 10.7.4.6 == +== HP DL380G6 esxi2, 10.7.4.6, iLO 10.1.2.102 == 
-calliope-www (cse www)\\+  calliope-www (cse www)\\ 
 +  - titan-printserver (new printserver)\\ 
 +  - mysql-server (NOT!)\\
  
 +== HP DL380G6 esxi3, 10.7.4.7, iLO 10.1.2.103 ==
 +  * zeus-debian\\
  
-== HP DL380G6 esxi3, 10.7.4.== +== HP DL380G7 esxi4, 10.7.4.125, iLO 10.1.2.104 == 
-zeus-debian\\+  - engineering www (jupiter)\\ 
 +  charybdis (NOT!)\\
  
 +== Dell R630 #1 (UP), 10.1.2.40, iLO 10.1.2.110 ==
 +  * examservers (NOT!)
  
-== Dell R630 #1 (UP) == +== scylla mounts == 
-examservers (NOT!)+  * mount /usr/home/{students,staff,grads}
  
 +== Εργαστήρια ==
 +  * Power up always on clients
 +  
 +== 3D printers ==
 +  * Sun Ultra20 poweron (+klipper, octoprint start)
 +  * Tevo Tarantula poweron
 +  * Z-printer poweron
 +  * Z-printer storage poweron
 +
 +== Close control units ==
 +  * Power on
 +
 +  
  